Line Arch Design

Custom Home Design

Complete design and construction documents for new single-family homes.

Rear elevation of a two-story white stone-clad home with a tile roof, a central glass entry, and twin reflecting pools.
Lake Merry ResidenceCustom home01
Rear of a two-story modern home at dusk, with a lit pool, a covered terrace, and a balcony.
Huntington ResidenceCustom home02
Starts with
The site: zoning, setbacks, height, and coverage
Delivered
Architectural, structural, and MEP documents
Compliance
Florida Building Code and local requirements

What Custom Home Design Covers

We begin with the site (zoning, setbacks, height and coverage limits, and what the lot will support), then develop the design from concept through final layout, elevations, and details.

The scope covers architectural plans, sections, elevations, details, structural, and MEP, coordinated across all disciplines and compliant with Florida Building Code and local requirements.

Front elevation of a two-story modern home with white stucco, a wood accent wall, and a glass entry.
Two-story modern home with stone columns, wood siding, a two-car garage, and a lit front walk at dusk.
Aerial view of a single-story home with a stone arched chimney, a slate roof, and wood and stone walls among mature oaks.

Frequently Asked Questions

Can you design a custom home from scratch, or do you also handle additions and remodels?

Both. We design new custom homes, and we handle additions and remodeling projects, with many remodeling projects already permit-ready. The difference is where the work starts. A new home starts from the site and the program, while an addition or remodel starts from documenting what already exists before anything new is drawn.

Do you work with a builder I choose, or do you have builders you recommend?

You bring your own builder. We do not require you to work with a specific one, and the drawing set is prepared so any qualified builder can price and build from it. If you have not chosen a builder yet, a complete permit-ready set is what lets you send the same documents to several of them and compare bids on equal terms.

What are the stages, from the first meeting to a permit-ready set?

Four stages carry a project from the first meeting to a permit-ready set: coordinating existing conditions, developing the layout, producing construction documents, and carrying the set through plan review until the permit is issued. Each stage closes with your approval before the next one opens, and engineering and site plan work run in parallel with the drawing set.

Can changes still be made once the design process has started?

Yes, though each phase has a design freeze point: after the final floor plan is approved, after the final exterior elevations are approved, and after the final set is issued. Those freezes protect accuracy and keep the project on schedule. Changes requested after a freeze may involve a revision fee and a rescheduled timeline, which we always review with you before proceeding.

What do you need from me to keep my project on schedule?

Each stage needs specific things from you: a signed proposal and a completed intake form to start, timely feedback and approval on each layout, and any missing documents, such as your survey or site information, as they come up. If something is missing, we hold that stage until we receive it, so responding promptly is what keeps your project moving.

See all questions

Rear of a stone home with arched windows, a covered patio, and a pool on a wood deck.

Start Your House

Tell us about the lot, the program, and your budget range. We will explain how the phases would run and what the design work costs.